Project description
The oil custody transfer metering system is located 60 km from the Skovorodino Oil Pump Station at the border with PRC at the Amur river crossing in the territory of the Russian Federation.
The oil custody transfer metering system is used for automated measurements of oil weight and measurements of oil quality parameters during settlement operations between PJSC Transneft and the China National Petroleum Corporation.
- Throughput capacity: 600 m³/h to 4,200 m³/h.
- Maximum pressure: up to 6.3 MPa.
Scope of supply
- Meter run assemblies;
- Oil quality control package;
- Fixed mechanical displacement prover;
- Master mechanical displacement prover;
- Pressure control unit;
- Spare oil metering unit;
- Secondary equipment, information processing system with hot redundancy;
- Power distribution system.
Equipment
Emerson, Siemens, Solartron, Krohne, Smith Metter Inc. FMC Solution, etc.
Software
Cropos hardware and software package developed by JSC Nefteavtomatika.
Timing
2010
Client
Transneft
Place
Amursk Region, Skovorodino
Other projects
All projects
Hydrocarbons metering systems
PRODUCTS CUSTODY TRANSFER METERING SYSTEM OF «NIZHNEKAMSK - 2» MAIN PUMPING STATION
Transneft
2016 - 2017
ACS for oil and gas production and treatment
AUTOMATED PROCESS CONTROL SYSTEM AND CENTRALIZED CONTROL CENTER OF INFRASTRUCTURE OF THE PYAKYAKHINSKOYE FIELD
Lukoil
2016-2017
ACS for oil transportation facilities
AUTOMATION OF INDUSTRIAL SITES «GRUSHOVAYA» and «SHESKHARIS»
Transneft
2014 - 2019
ACS for oil refineries and petrochemical plants
APCS FOR HYDROCRACKING UNIT WITHIN ORSK REFINERY OF PJSC ORSKNEFTEORGSINTEZ
Оrsknefteorgsintez
2017–2018